4 inch lay flat discharge hoseeigenvalues of adjacency matrix

Written by on November 16, 2022

(3) A worker shall not direct vehicular traffic if the normal posted speed limit of the public way is more than 90 kilometres per hour. (e) shall have a protective cover suitable to protect passengers from falling objects. 242/16, s. 11. (g) the communications system to be used among the drill rig operator, the drill rig front-end worker and other workers in the restricted access zone, or a system of prearranged visual signals to be used among them if those signals are clearly visible and understood by them. O.Reg. O.Reg. (b) has previously experienced decompression. O.Reg. 213/91, s.49 (5). 145/00, s.12. (a) at a location as close as is practicable to the work face; (b) in every work chamber near a door that leads to an air lock; (d) near every lock tenders work position; (e) adjacent to every compressor plant; and. For example, a rectangular tank with an inside width of 4 feet and inside length of 5 feet has a capacity of 4 x 5 x 7.5, or 150 gallons per foot of depth. (2) A hoist shall be installed in the service shaft as soon as is practicable. 242/16, s. 11. 26 ft vertical. Rated 4.2 out of 5 stars based on 6 reviews. 242/16, s. 11. 213/91, s.166(5); O. Reg. 126. 375/22, s. 5. 242/16, s. 11; O. Reg. (5) If workers are employed underground, a change room shall be provided with one shower and one washbasin for each group of ten or fewer workers. (2) A site-specific work plan for a suspended work platform system or boatswains chair shall include, at a minimum. 242/16, s. 11. 298. O.Reg. All lift pumps are designed to be submersible. Keeping the tank above the water table and pumping sewage from the house if necessary usually are best. 213/91, s.281(2). (9) The employer responsible for a multi-tiered load hoisting operation shall keep a copy of the following available for inspection at the project until the operation is completed: 2. (2) A multi-point suspended work platform shall be inspected by an engineer to determine whether it complies with the design drawings, or the design drawings subject to any deviations approved under subsection 142.2 (17), as the case may be, (a) after it is erected but before it is first used; and. 213/91, s.334(2); O.Reg. (b) shall be adequately supported so that it does not move out of position. O.Reg. Only a competent worker shall supervise the erection, alteration and dismantling of a scaffold. 213/91, s.124(1). This is around a 1- to 2-inch drop in 8 feet. 85/04, s.5(1); O. Reg. (7) A medical lock shall be maintained at a temperature of at least 18 degrees celsius, well-lit and well-ventilated and kept clean and sanitary. 242/16, s. 11. 627/05, s.7. (2) A runway, ramp or platform shall be designed, constructed and maintained to support or resist, without exceeding the allowable unit stresses for the materials of which it is made, (a) all loads and forces to which it is likely to be subjected; and. Machinery, equipment and material that is being used, left or stored where it may be a hazard to traffic on a public way shall be marked by flashing devices. The filter prevents nondecomposable materials (condoms, sanitary napkins and other items) from reaching the drainfield. O.Reg. (c) that is sealed to prevent the inadvertent opening of the valve. 242/16, s. 14 (1); O. Reg. Rated 4.4 out of 5 stars based on 7 reviews. Note the geotextile cover. 443/09, s.2(4). (1) No worker shall use an explosive actuated fastening tool unless it has a suitable protective guard. 213/91, s.204(6). (2) Sections 182, 187, 188, 189, 190, 191 and 193 do not apply to electrical work that is performed on or near electrical transmission or distribution systems if the work is performed in accordance with the document referred to in subsection (1). 26.6 (1) A fall arrest system shall consist of a full body harness with adequate attachment points and a lanyard equipped with a shock absorber or similar device. A positive report described in subsections 142.3 (4) and (5), if applicable. A worker shall use protection appropriate in the circumstances when there is a risk of eye injury to the worker. 145/00, s.15. There will be a work platform that has more than two primary suspension lines. 375/22, s. 5. It can cause the water and sewage to back up into the house. 213/91, s.198(2). 213/91, s.232(1). A person could be endangered by the vehicle, machine or equipment or by its load. 213/91, s.385(5). (3) An owner who has been advised under clause (2) (d) shall ensure that the fixed support in question is not used until the requirements in subsections (4) and (5) are met, as applicable. 375/22, s. 5. (3) All vehicles, machines, tools and equipment shall be used in accordance with any operating manuals issued by the manufacturers. O.Reg. 375/22, s. 5. O.Reg. 213/91, s.282(3). 112. 85/04, s.12. (b) by testing the principal components to their ultimate strength in a manner that simulates the actual loading conditions to which the formwork, falsework or re-shoring is likely to be subjected and by applying a reduction factor, in accordance with good engineering practice, to the values of ultimate strength. (6) The facilities may be located not more than 3 kilometres from the work area if transportation to the facilities is provided for workers where reasonably required. 3. 213/91, s. 202(4). 345/15, s. 9. O.Reg. 145/00, s.38. (1) An emergency electrical lighting system shall be provided and maintained in each air lock and work chamber. 242/16, s. 11. O.Reg. (b) have a positive stop that prevents the rope grab or other similar device from running off the end of the lifeline. 242/16, s. 11; O. Reg. 213/91, s.149. O.Reg. (iv) identifying and using fixed supports for a suspended work platform system or boatswains chair and for the workers fall arrest system. 213/91, s.242(1). 213/91, s.335(2). (2) No vehicle, machine, tool or equipment shall be used, (b) when the weather or other conditions are such that its use is likely to endanger a worker; or. O.Reg. (2) No explosive load for an explosive actuated fastening tool, (a) shall be stored in a container with explosive loads of other strengths; or. The sides of the lagoon should have a 3-1 slope or more. (a) before a conveyance is first put into service on a project; (b) at least once every three months after being put into service on the project; and. O.Reg. (a) the maximum length of work periods for the workers in the chamber; (b) the minimum length of rest periods for workers in the chamber; and. (1) No worker shall enter a well or augered caisson where the excavation is deeper than 1.2 metres unless. 145/00, s.41(1). 213/91, s.213(3). (2) Except in an emergency, a door in an ancillary air lock into air at atmospheric pressure shall be kept open. (1) The supervisor in charge of a project, (a) shall establish the maximum speed for a conveyance transporting persons in a hoistway; and. (b) its brakes shall be set or other measures, such as blocking, shall be taken to prevent its moving. O.Reg. 4. 213/91, s.249(2). Ultrasonic testing; (essai non destructif), public way means a highway or other street, avenue, parkway, driveway, square, place, bridge, viaduct, or other open space to which the public has access, as of right or by expressed or implied invitation; (passage public), rated platform capacity means the combined weight of occupants, tools, equipment and other material that the manufacturer has indicated can be safely carried by a suspended work platform, work platform module or boatswains chair; (capacit nominale de la plateforme), roadway means the travelled portion of a highway; (chausse). 213/91, s.160(1). 179. 145/00, s.28; O. Reg. The pressure distribution system is constructed from either 1- or 1-inch PVC pipe. If the manhole access is at ground level, it should have a locking bracket or be chained shut with a padlock (Figure 5). 213/91, s.270(2). O.Reg. It shall have a top rail, an intermediate rail and a toe board. 48. Pump bodies are commonly made from cast bronze, cast iron and plastic. 213/91, s.362(1). (a) have three evenly-spaced rails that measure at least 38 millimetres by 140 millimetres; (i) measure at least 38 millimetres by 89 millimetres, (ii) extend the full width of the ladder, and, (iii) are braced by filler blocks that are at least 19 millimetres thick; and. O.Reg. 291. (e) unless the engineer who prepared the procedures specifies otherwise, appoint a competent worker to ensure that the procedures, including the inspections described in clause (7) (h), are followed before any multi-tiered load is moved. O.Reg. O.Reg. O.Reg. (b) shall be pivoted in such a way that it does not automatically invert when the lock is released. O.Reg. 263. The pipe joints and end caps must be glued. O.Reg. Todays Consumer Financial Protection Circular on surprise overdraft fees and the CFPBs compliance bulletin on surprise depositor fees lay out when a financial institutions back-end penalties likely break the law. No worker shall use as a work place a platform, bucket, basket, load, hook or sling that is capable of moving and that is supported by a fork-lift truck, front-end loader or similar machine. 213/91, s.265(1). 213/91, s.119(3). 213/91, s.87(3); O. Reg. $55.99 $ 55. 97. O.Reg. (2) A siamese connection shall be provided on the fire line at the surface of the shaft. Typical septic tank. O.Reg. 226. 242/16, s. 11; O. Reg. The chamber design has various permutations that range in width from 18 inches to 3 feet. 527/00, s.2(2, 3). Deep septic tank installation. 213/91, s.385(2). O. Reg. O.Reg. (6) The clinical tests referred to in clause (5) (c) shall include x-rays of the chest and shoulders, and hip and knee joints taken at least once every five years. (b) shall have a connection for the use of the local fire department outside the shaft or tunnel to which there is clear and ready access at all times. 58. (1) Every project shall be planned and organized so that vehicles, machines and equipment are not operated in reverse or are operated in reverse as little as possible. (2) Subsection (1) does not apply with respect to a conveyance located in a service shaft if the hoisting area is so remote from the stairway, ladder or ladderway that it is not possible for a load, bucket or device being hoisted or lowered to come into contact with the stairway, ladder or ladderway. O.Reg. (5) Stilts used in accordance with this section shall. O.Reg. 242/16, s. 11. (3) An emergency electrical lighting system shall be tested at intervals that are at least as frequent as recommended by the manufacturer and that are adequate to ensure that it will function in an emergency. O.Reg. (b) any other loads likely to be applied to it, including the loads specified in clause 6.1.5 (Design loads from forces imposed on a platform) of CSA Standard Z271-10. O.Reg. O.Reg. (2) Each clean-up facility shall meet the following requirements: 1. O.Reg. O.Reg. O. Reg. (a) three and one-half times the maximum load to which it is likely to be subjected if it is used on a device other than a tower crane and it winds on a drum or passes over a sheave; (b) five times the maximum load to which it is likely to be subjected if it is used on a tower crane and it winds on a drum or passes over a sheave; (c) three times the maximum load to which it is likely to be subjected if it is a pendant or is not subject to winding or bending; and. (b) a report prepared under subsection (7) or (8) indicates that the suspended work platform system has been installed in accordance with the drawing and approved deviations, if any. As far as practicable, no combustible material shall be installed in or stored in an air lock or work chamber. Magneto Induction Technology is optimized for performance on all stovetops, including induction. Occupational Health and Safety Act, R.S.O. If the mound is on sloping ground, use a berm on the uphill side to divert runoff water around the mound. 369. O.Reg. O.Reg. 186. 145/00, s.2. O.Reg. O.Reg. The outlet baffle allows sewage effluent to flow out of the liquid zone, retaining the scum in the tank. O.Reg. O.Reg. (b) above every area where work is being carried out. O.Reg. This Part applies with respect to work done in compressed air, other than work done in diving bells or work done by divers. star. 3. 181. O.Reg. 213/91, s.370. O.Reg. O. Reg. (d) include a statement that, in the opinion of the engineer who designed the platform, the design meets the requirements of clauses (a), (b) and (c). Optional high-intensity-discharge headlights Gimme Fire: Kia Recalls 73,000 Optimas for Leaking Fuel Hose. 26.8 (1) A safety net shall be designed, tested and installed in accordance with ANSI/ASSE Standard A10.11-2010, Safety Requirements for Personnel and Debris Nets. (3) Where mechanical track haulage is used in a tunnel, explosives or blasting agents shall not be transported on the locomotive or in the same car as the detonators. 213/91, s.357(1). O. Reg. 443/09, s.4. (1) Before work is begun in compressed air at a project, a constructor shall give written notice, (a) to the local police department and the fire department and public hospital nearest to the project; and. (1) The employer shall provide, free of charge, sugar and hot beverages for workers working in compressed air to consume during their rest periods. 157. 85/04, s.10. 117. O.Reg. The basal area is determined by the texture of the existing soil. On too flat a grade, the liquid will slow down, allowing the solids to settle out in the sewer pipe. (1) A flammable liquid or gas shall be stored, (a) as far as is practicable from a shaft; and. Place 2 inches of coarse gravel in the hole. 242/16, s. 11. (a) shall be placed against the side of the excavation so that it is vertical; (b) shall be secured in place by wales; and. If a trench becomes overloaded and effluent is coming to the surface, the outlets from the drop box can be blocked to allow the trench time to recover its ability to infiltrate effluent. The square footage (length and width) of required absorption trench for a given house and lot is based on the daily average wastewater flow and soil texture at the depth of the trench bottom. 443/09, s.4. (a) the cabin and its attachments have been specifically designed and fabricated for that purpose by the original manufacturer of the crane in accordance with good engineering practice; (b) the boom of the crane cannot affect or be affected by the operation of another crane or make contact with a structure or equipment; (c) the crane is not overlapped by any part of another crane; (d) because of specific site conditions, the location of the cabin on the boom provides greater visibility for the operator than does the manufacturers standard cabin location; (e) the means of access to the cabin or other locations on the boom is by a catwalk constructed of skid resistant expanded metal or similar material and fitted with solidly constructed guardrails and devices which provide fall protection for the operator; (f) the structural, environmental and ergonomic design of the cabin is equal to or greater than that of the cranes manufacturers standard cabin design; and. (a) shall be steel wire rope of the type, size, grade and construction recommended by the manufacturer of the crane or similar hoisting device; (b) shall be compatible with the sheaves and the drum of the crane or similar hoisting device; (c) shall be lubricated to prevent corrosion and wear; (e) shall have its end connections securely fastened and shall be kept with at least three full turns on the drum. (2) Despite clause (1) (a), a scaffold with structural components whose capacity can only be determined by testing shall be designed and constructed to support or resist three times the maximum load or force to which it is likely to be subjected without causing the failure of any component. (iv) has a revised load rating chart prepared by an engineer in accordance with good engineering practice and affixed in a conspicuous place on the crane, (v) has, on its hoist line, hooks equipped with self-closing safety catches at the point where the platform is suspended, and. 213/91, s.14(1). The document described in clause (8) (a). 213/91, s.152(3). (6) The leads to the face shall be short-circuited when the contacts of the device are in the open position. (c) only one of the locks is being used to compress or decompress a worker. 213/91, s.339(1). (11) Before beginning any hoisting operation under this section, the constructor shall notify by telephone an inspector in the office of the Ministry of Labour nearest to the project. The constructor shall ensure that every worker at the project has ready access to a telephone, two-way radio or other system of two-way communication in the event of an emergency. 213/91, s.215(1). (1) The walls of an excavation shall be stripped of loose rock or other material that may slide, roll or fall upon a worker. If the house sewer pipe is less than 4 feet below ground surface, it needs to be insulated in the trench for frost protection. A socket wrench is one having a cavity to receive a square or hexagonal end. 213/91, s.382(1). O.Reg. 1-1/4 inch NPT discharge for high capacity pumping; includes 3/4 inch garden hose adapter ; Removable suction screen and handles up to 1/8 inch solids ; Superior Pump 99621 Lay-Flat Discharge Hose Kit, 1-1/2-Inch by 25-foot. Washed rock is important because most rock has fine clay attached. Rated 5 out of 5 stars based on 1 reviews. 213/91, s.227(1). 121. (c) shall not open outward. (e) a description of any unusual occurrence respecting the worker, the air lock or any related matter. 213/91, s.360(2). 142/17, s. 30. O.Reg. O.Reg. (1) No person, other than a person authorized to do so by the supervisor in charge of the project, shall enter or be permitted to enter a room or other enclosure containing exposed energized electrical parts. O.Reg. 156.7 (1) No worker shall operate a rotary foundation drill rig except in accordance with this section. (4) No person other than the driver shall ride on a haulage locomotive. 213/91, s. 202(1). O.Reg. O. Reg. California voters have now received their mail ballots, and the November 8 general election has entered its final stage. (cart de 10 millimtres) O.Reg. (4) Rotation-resistant wire rope shall not be used for a cable for boom hoist reeving and pendants. O.Reg. O.Reg. There will be stacked or tiered work platforms. 213/91, s.101(1). (a) consist of adequate oral and written instruction on. O.Reg. (12) The constructor shall keep at the project for the duration of the project, (a) a record of the servicing, cleaning and sanitizing of the facilities; and. (1) A portable ladder at a project shall be manufactured and shall meet the design, performance, test and marking requirements of a Grade 1, Grade 1A or Grade 1AA ladder in the CSA Standard Z11-12, Portable Ladders. 145/00, s.21; O. Reg. 114. 627/05, s.4; O.Reg. O.Reg. 282. 0.2" solids. (i) at least 152 millimetres by 152 millimetres, for a shaft that is not more than 2.7 metres deep, (ii) at least 203 millimetres by 203 millimetres, for a shaft that is more than 2.7 metres but not more than 4.3 metres deep, and. All tools, devices and equipment, including personal protective equipment, that are used for working on or near energized exposed parts of electrical equipment, installations or conductors shall be designed, tested, maintained and used so as to provide adequate protection to workers. (4) Clause (2) (d) and subsection (3) do not apply to a building. (3) Such precautions as the engineer specifies shall be taken. O.Reg. (2) An engineer shall specify in writing the precautions required under subsection (1). Last, cover the mound with 6 inches of good top soil and seed to grass. 345/15, s. 23. 213/91, s.352(6). When no people are in the air lock, MATERIAL IS COMING OUT. (1) Despite subsections 26.1 (1) and (2), if the following conditions are met, a worker shall wear a lifejacket or other personal flotation device that is adequate: 1. O.Reg. "Sinc Never construct trenches in loam or clay loam soils under wet conditions. 375/22, s. 4, 5. (c) is expected to require more than five days to complete. (2) Subsection (1) does not apply to a work platform within the meaning of section 136.1 that is able to be moved to give access to a floor, roof or platform or to ground level. 213/91, s.213(1). (3) Before work is begun in compressed air, the employer shall obtain written permission from a Director. On one side it shall be high-intensity retro-reflective grade red in colour, with the word STOP written in legible high-intensity retro-reflective grade white letters 150 millimetres high in a central position on the sign. (1) No vehicle, machine or equipment shall be drawn or towed by another vehicle on a project unless there are two separate means of attachment to the vehicle drawing or towing it. O.Reg. O.Reg. 213/91, s.357(5). (3) Subsection (2) does not apply with respect to. (c) while it is being repaired or serviced, unless the repair or servicing requires that it be operated. O. Reg. O. Reg. O.Reg. (3) The design of a fixed support shall use the factored loads calculated in accordance with subsection (4). (3) No cable that is static or is used for pendants, (a) shall contain three or more broken wires in one lay or in a section between end connectors; or. Methods of securing a manhole cover to prevent unauthorized entry. 213/91, s.14(4). O.Reg. It is available in home supply and hardware stores. 39. (b) within a horizontal distance from each wall equal to the depth of the excavation measured away from the excavation. Figure 13. This usually ends up being false economy. 85/04, s.15; O. Reg. 213/91, s.57(5). (b) shall be supported by either cleats secured to the sheathing or posts set on the wale next below it or, if it is the lowest wale, on the bottom of the excavation. O.Reg. All open sides of the work surface are adequately guarded. (1) No tower crane shall be erected at a project except in accordance with this section. (5) A component of a fixed support that may be subject to overturning shall be designed and constructed to support at least four times its allowable suspended load or force. O.Reg. O.Reg. The top of the sand bed should be level the full length of the mound. 85/04, s.2. 145/00, s.27. O. Reg. 259. (b) shall have a label stating the use for which the container is approved and the name of the testing laboratory which gave the approval required by clause (a). (8) All other parts of a suspended work platform not listed in subsection (2) shall be inspected for damage at least once within the 12-month period preceding its use on a project and at least once annually while in use on a project. (c) has a door into air at atmospheric pressure. Discover all the collections by Givenchy for women, men & kids and browse the maison's history and heritage O.Reg. 242/16, s. 11. (b) shall be adequately braced to prevent any movement that may affect its stability or cause its failure or collapse. 213/91, s.379. O.Reg. (10) An employer shall ensure that a worker who uses stilts is trained in their use by completing an adequate training program that, (a) enables the worker to demonstrate proficiency in the safe and proper use of stilts; and, (b) provides instruction on the relevant requirements of this Regulation; and. 345/15, s. 19. Household wastewater sometimes is referred to as black water or gray water, depending on which appliance or fixture it came from. (3) Clause (2) (b) does not apply to a ladder lying on an excavation wall that is sloped, as required by section 234. 279. (3) A hoisting hook shall have its load rating legibly cast or stamped on it in a location where the person using the hook can readily see it. (b) meet the requirements of clause 8 (Hoisting) of CSA Standard Z271-10. O. Reg. O.Reg. 242/16, s. 11. O.Reg. If the trench bottom has any slope, all the effluent will collect at the low spots. (a) inform workers of the location of the facilities; and. 103. O.Reg. (a) that are adequate to protect him or her against electrical shock and burn; (b) that have been tested and certified in accordance with subsection (2), if applicable; and. 159. state the number of workers that can safely be attached to it, iv. (i) the relevant requirements of this Regulation. 213/91, s.166 (1). O.Reg. (b) if the CSA Standard Z271-10 requires the inspection or test be performed by a person with specific qualifications, such person. An explosive shall remain in its original wrapper unless it is manufactured and intended for use other than in its original wrapper. (1) A service shaft that will be over thirty metres deep when completed shall have a hoist with a conveyance consisting of a cage or car suitable for transporting workers. 213/91, s.353(1). 213/91, s.338(1); O. Reg. 213/91, s.351(5). (o) information about ready access to a two-way communication system, such as radio, telephone or other similar means, to be provided to a worker using a suspended work platform system or boatswains chair. Opportunity Zones are economically distressed communities, defined by individual census tract, nominated by Americas governors, and certified by the U.S. Secretary of the Treasury via his delegation of that authority to the Internal Revenue Service. (1) A constructor shall appoint a supervisor for every project at which five or more workers will work at the same time. Oven safe up to 600F (lid up to 425F), Dishwasher safe, Angled walls make sauting, frying, and stir-fries simple, Magneto Induction Technology is optimized for performance on all stovetops, including induction, Oven safe up to 600F (lids up to 425F), Dishwasher safe, Range: Professional 30 Dual Fuel Cooking with a Gas Cooktop and an Electric Convection Oven with 4 Italian Made Sealed Burners, Refrigerator: Counter Depth 21.6 cu. O.Reg. (2) The employer shall make the permanent equipment logs available to an inspector on request. (c) such clinical tests as the project physician may require. The house plumbing system includes waste pipes, vent pipes and water traps (Figure 1). 213/91, s.21(3). 627/05, s.3. Soil texture and the number of bedrooms in the house determine the necessary bottom area of an absorption bed (Table 4). Gas from a septic tank has a bad odor, may cause serious illness, and in some situations, can be explosive. 213/91, s.249(1); O. Reg. (b) adequate eye protection. (6) If the soil conditions on a project differ from those assumed by the engineer in designing a prefabricated, hydraulic or an engineered support system, an engineer shall modify the design drawings and specifications for the actual soil conditions or shall approve the support system for use in the actual soil conditions. 242/16, s. 1 (1), 12 (5); O. Reg. 399. 64/18, s. 3 (1). 242/16, s. 11; O. Reg. O. Reg. (2) Subsection (1) does not apply with respect to an excavation. O.Reg. O.Reg. A hook block shall have its load rating and weight legibly cast or stamped on it in a conspicuous location. 213/91, s.288(5). Did you use the search tool on the NDSU Agriculture website to try to find what you were looking for? 213/91, s.306(2). 10. 627/05, s.7. (2) If the ties interfere with the use of the bottom of the tunnel as a walkway, a solid walkway that is at least 300 millimetres wide shall be provided. By periodically checking the water meter, you will be able to determine when the tank is full. Longitudinal buffer areas. 345/15, s. 24. 384. Help safeguard the life youve built with term life insurance protection. (d) ten times the maximum load to which it is likely to be subjected if the crane or similar hoisting device is used for supporting persons. (3) If an excavation contains more than one type of soil, the soil shall be classified as the type with the highest number as described in section 226 among the types present. (b) shall be left unattended where it may be available to a worker who is not qualified to operate an explosive actuated fastening tool. For our three-bedroom home example, the rock bed or gravelless systems will be about 375 feet2 6 = 63 feet long. O.Reg. 145/00, s.15; O.Reg. (2) A worker shall not direct vehicular traffic for more than one lane in the same direction. (5) When water flush toilets or non-recirculating chemical flush toilets are provided, the minimum number of toilets required at the project is as follows: Column 2 Number of workers regularly employed at the project, 4, plus 1 additional toilet for each additional group of 15 or fewer workers.

Acura Mdx Size Vs Honda Pilot, Geometric Applications Of Exponents Worksheet, 26 Hyde Park Gate, London, Mistral Michelin Star, Weather Prince Edward Island October, Accel 8140 Super Stock Coil, Pop Culture Quiz 2022 Kids, Floor Cleaning Services Near New Milford, Ct,